Buying a lot? Check these nine things first.

What to verify before you buy land to build on: zoning, slope, soils, trees, services, easements and demolition — and what each surprise typically costs when it's missed.

GuidesFebruary 20268 min read

The most expensive mistakes in custom building happen before any design exists — on the day the lot is bought. Nine checks, in order, before you remove conditions on any building lot in Metro Vancouver.

What a missed check costs

Steep slope / retainingSteep slope / retaining: up to $150k+up to $150k+Poor soils / geotech surprisesPoor soils / geotech surprises: up to $90kup to $90kRock excavationRock excavation: up to $80kup to $80kService connections & upgradesService connections & upgrades: up to $60kup to $60kDemolition & hazmat abatementDemolition & hazmat abatement: up to $55kup to $55kTree protection & replacementTree protection & replacement: up to $45kup to $45k
Representative cost impacts when site conditions surface after purchase instead of before. Every one of these is discoverable during due diligence.

The nine checks

Zoning & buildable envelopeFree

What can this lot legally hold — floor area, height, multiplex or laneway potential? This sets the land's real value.

Slope & drainage

Walk it in the rain. Slopes add retaining, stepped foundations and drainage engineering.

Soils & geotech

A desktop geotech review before purchase; a drilled report before design. Peat, fill and high water tables are budget events.

Protected trees

Bylaw-protected trees (on the lot and neighbouring) shape the buildable footprint more than most bylaws.

Services at the lot line

Water, sewer, storm and Hydro capacity — an upgrade or new connection is a five-figure line.

Easements & rights-of-way

A title search reveals covenants, easements and building schemes that can sterilize part of the site.

Existing structure & hazmat

Pre-1990 homes routinely carry asbestos; abatement is priced per discovery, so price it before offer.

Street & access

Corner lots, lanes and flanking streets change laneway eligibility, parking rules and construction logistics.

The neighbours' precedents

What was recently approved nearby tells you how the municipality actually rules on variances here.

Bring us the listing before you offer. A feasibility review during your subject period turns eight of these nine checks into answers — free, and occasionally it will talk you out of the wrong lot. That's the point.
9Checks before firm offer
$0Feasibility during subjects
$150k+Cost of the worst surprise
1Lot you actually need
Found a lot you're serious about?

Send us the address during your subject period — zoning, slope, trees and services checked before you're committed.

Book a Free Consultation

✱ Representative planning figures for Metro Vancouver, mid-2026 — assembled from municipal permitting schedules, the BC Energy Step Code framework and Armacan project records. Every lot and scope is different: treat these as orientation, not a quote, and confirm against your property in a free consultation.