Commercial Projects

Precision, schedule and finish.

Select commercial projects and tenant improvements — retail, office and light industrial — delivered with residential-grade finish discipline and hard deadlines met.

Modern commercial interior

Your opening date is our deadline

Commercial work runs on dates: lease commencements, fixturing windows, opening days. We build backwards from yours — realistic scheduling, long-lead procurement early, and inspections sequenced so occupancy isn't the surprise at the end.

Landlords and tenants alike get one point of accountability, clean sites in operating buildings, and finish quality that shows.

Tenants fitting out retail, office or clinic space Landlords repositioning or improving their buildings Franchisees building to brand standards on a deadline
8–16 wkTypical TI timeline
OccupiedBuilding experience
On-dateTurnover discipline
Scope

What's included

Everything below is coordinated by one team, under one contract.

  • Test-fit & budget validation
  • Design & permit coordination
  • Landlord & building-rules management
  • After-hours work in occupied buildings
  • Long-lead procurement
  • Milestone schedule with reporting
  • Occupancy & final inspections
  • Deficiency-free turnover
How it works

From first call to keys

01

Test-Fit FREE

Scope, budget and schedule reality-check.

02

Permits & Procurement

Approvals filed, long-lead items ordered.

03

Build-Out

Milestone schedule, clean site, weekly reports.

04

Occupancy

Inspections passed, space turned over.

Investment & Timeline

Budgets and calendars that hold

Commercial numbers by space type, and the week-by-week calendar we build backwards from your opening date.

$125$250$375$500Office fit-outOffice fit-out: $80–$160 /sq ft$80–$160 /sq ftRetailRetail: $100–$200 /sq ft$100–$200 /sq ftClinic / medicalClinic / medical: $180–$320 /sq ft$180–$320 /sq ftRestaurant / food serviceRestaurant / food service: $250–$450 /sq ft$250–$450 /sq ft
Base building to opening-ready. Ventilation, medical gas and kitchens drive the upper bands.
Wk 0Wk 7Wk 14Wk 21Wk 28Design & drawingsDesign & drawings: 4–6 wks4–6 wksPermits (TI stream)Permits (TI stream): 6–10 wks6–10 wksConstructionConstruction: 10–14 wks10–14 wksInspectionsInspections: 2–4 wks2–4 wks
Permits and long-lead procurement run beside design — series-sequenced projects are the ones that miss openings.
~6Months, lease to opening
1Point of accountability
After-hoursOccupied-building capable
0Surprise change-order model
Two Ways to Buy

Design-build TI vs. bid-and-build

Armacan design–buildBid-and-build GC
Time to a real price2–3 weeks2–3 months (after full drawings)
Who owns drawing gapsWe do — one contractYou do — via change orders
Schedule certaintyBackwards from opening dayBest-efforts after award
Long-lead equipmentOrdered at design sign-offOrdered after award — often late
Fit for hard deadlinesBuilt for themFragile under them
When to bid instead: fully-documented, repeat-format spaces with generous timelines can bid well. Bring us the drawings — if bidding serves you better, we'll say so.

✱ Representative Metro Vancouver planning figures, mid-2026. Your number comes from your lot, your scope and current pricing — confirmed in writing at a free consultation.

Recent work

Recent commercial projects

Deck & Services
Deck & ServicesCommercial · Richmond
Structure Phase
Structure PhaseCommercial · Burnaby
In Their Words

Opened on the day it said

“Our clinic opened on the exact date on the schedule they drew in month one. We were booking patients before drywall — that's how sure we were.”

Dr. S. Atwal — Clinic Fit-Out, Richmond

What you'll leave the first meeting with

  • A validated budget per square foot for your actual space
  • A week-by-week schedule built backwards from your opening date
  • The permit path and landlord-approval plan
  • A long-lead equipment list with order-by dates
Go Deeper

Reading for tenants & landlords

Good to know

Common questions

We take select tenant improvements where the scope is meaningful — call us and we'll tell you straight within one conversation.

Yes — after-hours phasing, dust and noise control, and building-management coordination are standard for us.

We do, end-to-end — including the final inspections that let you open on the date on your lease.

Yes — we regularly price and build from franchise packages and third-party architect drawings, or provide full design-build where you need it.

We schedule backwards from it: long-lead equipment ordered at design sign-off, permits and procurement in parallel, weekly look-ahead schedules, and occupancy inspections booked before the paint dries.

Have a space and a date? Let's work backwards from it.

Free test-fit review — scope, budget and schedule in plain English.